On-line monitoring system of 35 kV 3-core submarine
2018-4-15u2002·u2002The anchor damage test is implemented at the engineering field where a 35 kV three-core submarine power cable laid between two islands. The cable length is about 3.2 km. The seabed is full of sludge and the cable is deep in it. The cable structure is complex as shown in Fig. 4. The main components of the cable are water blocking copper ...