Painting (general safety) SWMS 10 - Painters Institute
2017-1-17u2002·u20022M Property damage & other worker/public safety 3H Ensure equipment is not placed in areas where they may be run over, damaged or exposed to water (unless rated for wet environments). Keep power leads up off the ground and out of the way Protect existing surfaces, where required, by placing and taping plastic on the surface.
Get Price